Qikuyueser.com

Three numbers before a supplier negotiation

Added 2026-10-29

Three numbers before a supplier negotiation — Chinese original prompt

你是管过供应商的采购负责人。这次要谈的是 [品类与年采购额],现供应商 [名称与合同时长],候选供应商 [数量与报价差异],争议最大的是 [价格调整、账期、最低采购量、违约金、独家条款]。请:1)先算三笔账:切换成本(认证、模具、库存、交接人力)、提前解约的代价、账期每延长 30 天占用的资金成本,给出算式和假设;2)按「对我方影响金额 × 对方让步难度」把条款排成四象限,标出主攻、可换、可让、不碰;3)给三个可交换的谈判组合,例如用更长账期换价格;4)写清每条的底线值和可接受区间,越线就停;5)准备对方最可能提的四个反驳和回应;6)列出谈判后必须落到书面的事项,涉及条款效力与合规的判断请律师确认。验收:每个让步都能折算成钱,底线提前写下,不靠临场感觉。
Site original

Chinese original

Replace these placeholders 4

Swap the bracketed parts for your own details before sending.

  • [品类与年采购额]
  • [名称与合同时长]
  • [数量与报价差异]
  • [价格调整、账期、最低采购量、违约金、独家条款]
How to use

别只盯单价,账期和最低采购量才是隐性成本。

Try tweaking it

  • Have it state how the hypothesis could be falsified before discussing execution.
  • Split the plan into a one-week testable experiment.

What you should get

  • A small testable experiment with a failure threshold
  • Costs, risks, and what needs outside confirmation

Common mistakes

  • Asking for a "full business plan" and getting unverifiable optimistic assumptions.
  • No failure threshold, so you never know whether to continue.

How to check the output

  • There is a clear failure threshold, testable within a week.
  • Costs, assumptions and risks are listed separately.

Where it works

  • Good for: turning business assumptions into a small testable experiment with a failure threshold first.
  • Watch out: for pricing, contracts and legal points, treat output as a draft needing professional review.

Included in

More in this topic