Qikuyueser.com

Structure a Postmortem Report

Added 2026-10

Structure a Postmortem Report — Chinese original prompt

请根据 [故障经过与日志],写一份复盘报告:影响范围与持续时间、按分钟的时间线、直接原因与根本原因的区别、处置过程中哪些判断是对的哪些走了弯路,以及可落地的改进项。输出:报告正文、改进项清单(负责人、截止时间、验收标准)、需要同步给客户的说明口径。
Site original

Chinese original

Open in ChatGPT

Example

Sample input

故障经过和日志在下面,是一次支付回调堆积,持续四十分钟,帮我写复盘报告。

The output should include

  • 影响范围与分钟级时间线写清
  • 直接原因与根本原因分开写
  • 改进项带负责人截止与验收

Replace these placeholders 1

Swap the bracketed parts for your own details before sending.

  • [故障经过与日志]
How to use

改进项要能验收,写「加强监控」这种等于没写。

Try tweaking it

  • Have it restate requirements and constraints before writing code.
  • Ask for the smallest change plus a rollback path, not a full-file rewrite.

What you should get

  • A minimal, runnable change with copy-ready code
  • Impact list: which files and call sites must follow

Common mistakes

  • Asking it to touch ten files at once, then losing track of what broke what.
  • Pasting only the error, with no code or version, and getting an unfixable answer.

How to check the output

  • The change runs, can be rolled back, and touches nothing unrelated.
  • Edge cases (empty, oversized, concurrent) are covered or explained.

Where it works

  • Good for: having it restate requirements and constraints, then propose the smallest runnable change.
  • Watch out: include versions and a minimal reproduction with the error, or the fix may look plausible but not fit.

More in this topic