Design a First Task for New Hires
Added 2026-10
Design a First Task for New Hires — Chinese original prompt
有一位新同事要加入 [团队],需要给他设计第一个开发任务。请选一个能在一周内完成、能触达从提交到上线的全流程、且不涉及核心链路的改动,并说明它会经过哪些环节。输出:任务描述与验收标准、需要谁配合、预期会卡住的地方、以及完成后他应该掌握的几件事。
Site original
Chinese original
Example
Sample input
有位新同事要加入支付团队,给他设计第一个开发任务,一周内能跑通提交到上线全流程。
The output should include
- 选不涉核心链路、一周能完的改动
- 给任务描述、验收标准与配合人
- 说明预期卡点与应掌握的几件事
Replace these placeholders 1
Swap the bracketed parts for your own details before sending.
[团队]
How to use
别给纯文档任务,第一周要让他真的改一行代码并看到它上线。
Try tweaking it
- Have it restate requirements and constraints before writing code.
- Ask for the smallest change plus a rollback path, not a full-file rewrite.
What you should get
- A minimal, runnable change with copy-ready code
- Impact list: which files and call sites must follow
Common mistakes
- Asking it to touch ten files at once, then losing track of what broke what.
- Pasting only the error, with no code or version, and getting an unfixable answer.
How to check the output
- The change runs, can be rolled back, and touches nothing unrelated.
- Edge cases (empty, oversized, concurrent) are covered or explained.
Where it works
- Good for: having it restate requirements and constraints, then propose the smallest runnable change.
- Watch out: include versions and a minimal reproduction with the error, or the fix may look plausible but not fit.