Check Before Installation Day
Added 2026-10
Check Before Installation Day — Chinese original prompt
我要装 [家电名称],型号 [型号],房子情况是 [楼层、墙体、水电位置、门宽与电梯尺寸]。请列出安装前必须确认的条件清单:电源规格、插座位置、进水排水、承重与墙体、搬运通道尺寸、是否需要额外配件。每项写清怎么自己量、不合格会怎样。仅作参考,以厂家安装规范为准。
Site original
Chinese original
Example
Sample input
要装一台燃气热水器,型号写在下面,房子六楼、老小区砖墙、门宽七十、电梯很小。
The output should include
- 按项列安装前必须确认的条件
- 每项写清怎么自量和不合格的后果
- 仅作参考,以厂家安装规范为准
Replace these placeholders 3
Swap the bracketed parts for your own details before sending.
[家电名称][型号][楼层、墙体、水电位置、门宽与电梯尺寸]
How to use
把测量结果拍照发给客服做书面确认,出问题时有依据。
Try tweaking it
- Ask for a checklist and timeline, marking which parts need a professional.
- Replace "what should I do" with "which three things first, and when".
What you should get
- An ordered action list with deadlines
- What must be confirmed with a professional or official channel
Common mistakes
- Using it as the doctor or lawyer and acting on the answer directly.
- Taking a single conclusion without asking about preconditions or real costs.
How to check the output
- It gives an order of steps and a decision deadline.
- It flags what must be confirmed with a doctor, lawyer or official channel.
Where it works
- Good for: turning everyday decisions into checklists and timelines, flagging what needs a professional.
- Watch out: health, insurance and legal output is reference only — confirm with a doctor, broker or lawyer.