Qikuyueser.com

Prepare a Leadership Update

Added 2026-11-02

Three minutes: progress, risk, the decision you need.

I have a five-minute update for leadership (context below). Prepare: 1) minute one — the conclusion and key numbers; 2) minute two — risks and responses; 3) the final minute — the decision or resource I need; 4) the three questions they are most likely to ask, with answers; 5) where I am likely to over-explain; 6) a one-page outline of six lines or fewer. No opening pleasantries.
Site original

Chinese original

Open in ChatGPT
How to use

管理层只需要三样:进展、风险、要我批什么。

Try tweaking it

  • Have it state how the hypothesis could be falsified before discussing execution.
  • Split the plan into a one-week testable experiment.

What you should get

  • A small testable experiment with a failure threshold
  • Costs, risks, and what needs outside confirmation

Common mistakes

  • Asking for a "full business plan" and getting unverifiable optimistic assumptions.
  • No failure threshold, so you never know whether to continue.

How to check the output

  • There is a clear failure threshold, testable within a week.
  • Costs, assumptions and risks are listed separately.

Where it works

  • Good for: turning business assumptions into a small testable experiment with a failure threshold first.
  • Watch out: for pricing, contracts and legal points, treat output as a draft needing professional review.

More in this topic