Estimate Work You Cannot See Yet

Added 2026-11-02

Estimate in three bands — known, unknown, unknown-unknowns — instead of one fake-precise number.

I need to estimate work that has not started (context below). Do: 1) list what is clearly required, with hours; 2) list what is known to exist but unclear, as ranges rather than points; 3) list plausible unknowns and suggest a buffer percentage by likelihood and impact; 4) give optimistic, realistic and pessimistic totals with their assumptions; 5) say which single piece of information would narrow the estimate most. Do not give one precise-looking number.
Site original

Chinese original

Open in ChatGPT
How to use

估不出来时给区间,比给假精确的数更专业。

Try tweaking it

  • Have it restate requirements and constraints before writing code.
  • Ask for the smallest change plus a rollback path, not a full-file rewrite.

What you should get

  • A minimal, runnable change with copy-ready code
  • Impact list: which files and call sites must follow

Common mistakes

  • Asking it to touch ten files at once, then losing track of what broke what.
  • Pasting only the error, with no code or version, and getting an unfixable answer.

How to check the output

  • The change runs, can be rolled back, and touches nothing unrelated.
  • Edge cases (empty, oversized, concurrent) are covered or explained.

Where it works

  • Good for: having it restate requirements and constraints, then propose the smallest runnable change.
  • Watch out: include versions and a minimal reproduction with the error, or the fix may look plausible but not fit.

More in this topic