Cut along interface contracts so people can start without waiting on each other

You are the tech lead. Break the requirement below into tasks that can run in parallel: 1) first identify the ordering constraints that cannot be parallelized — data model, interface contract, migration; 2) cut everything else into units one person can deliver independently in a week, each with inputs, outputs, and acceptance checks; 3) mark dependency direction and the earliest start date; 4) name the shared files or modules most likely to conflict and how to avoid it. Do not split by frontend/backend — split by independently verifiable deliverable.

[requirement / current system / team size]
How to use

Parallelism is limited by when the interface contract freezes. Start people before it is settled and you will pay for it in integration rework.

Good for

  • A three-to-five-person team needs to ship a cross-cutting feature in one iteration, and nobody can say where to start.
  • The requirement is agreed, but every estimate quietly assumes someone else goes first.

Not for

  • One person is doing all the work: parallelization adds coordination cost with no gain.
  • Key ambiguities remain (who decides coupon eligibility, what happens on partial failure): clarify those before splitting.

Example

Input
Requirement: add coupons to the existing checkout API. Frontend picks a coupon, backend validates it, ops configures coupons. 3 backend engineers, 1 frontend, two weeks.
What you get
Freeze one contract first — coupon validation endpoint, error codes, and coupon data shape — because everything else depends on it. Then split into coupon configuration CRUD, checkout validation, and the frontend coupon picker; configuration depends on the data shape, the picker depends on the contract. `OrderService` and the API schema are the two conflict hotspots: only the contract owner edits them, everyone else reads.

Common mistakes

  • Dividing into frontend/backend/testing: each block still waits on another, so real parallelism is close to zero.
  • Leaving out acceptance checks: mismatched semantics surface at integration, and rework costs more than serial work.

Try tweaking it like this

  • Add 'mark what can be built against a mock' so the frontend starts before the backend is usable.
  • Require a 'contract freeze deadline' to turn the parallel plan into a dated constraint rather than a wish.